Pearl Mantels 2019
Installation is done following a 3 step plan. It is recommended that 2 people be available for installation. Note: We suggest consulting a local expert if you are unfamiliar with masonry assembly and installation. Masonry installation: Install corbels onto the masonry by attaching the brackets with 1/2” x 4” lag screws using suitable anchors. You will need 2 per corbel. For even weight distribution of the shelf, mount corbels approximately 12” in from each end on the 5 ft. shelf and 18” on the 6ft. shelf. After corbels are installed apply mortar or construction adhesive, per manufacturer’s product instructions, to the top of each corbel and to the back of the shelf. Set mantel on top of corbels, arrange so that it is centered on the corbels and press against the wall. If necessary, clean with a slightly dampened cloth. Commercial cleaning products are not recommended. If this is new construction, the stone will go over the brackets keeping them out of sight. If this is a retrofit, use any stone parts that were chipped out in order for the shelf to fit to hide the brackets. If installing to drywall, it will be necessary to cut the drywall away and install additional blocking between the studs to support the weight of the corbels and shelf. Hide the corbel brackets when reinstalling the drywall or hide with whatever material you may be using over the drywall (i.e. stone veneer, tile, etc.) Because each piece is individually hand crafted and poured, overall measurements may vary up to 1/2” and we recommend that the mantel shelf and corbels be installed first, then install the stone around the shelf. This insures a secure fit for the mantel and brackets. If there are any gaps, they should be filled with mortar joint. Please consult a professional if necessary. Because each piece is individually hand crafted and poured, overall measurements may vary up to 1/2” and we recommend that the mantel shelf and corbels be installed first, then install the stone around the shelf. This insures a secure fit for the mantel and brackets. Lead time 2 weeks. Order by color and length. Made to order. Minimum 2 week leadtime. 5 Foot Shelf Shelf Length: 60” Shelf Depth: 12” Corbel Height: 9” Corbel Depth: 9” Corbel Width: 4” Overall Height w/o Corbel: 3.5” Overall Height w/ Corbel: 12.5” Weight: 78 lbs. 6 Foot Shelf Shelf Length: 72” Shelf Depth: 12” Corbel Height: 9” Corbel Depth: 9” Corbel Width: 4” Overall Height w/o Corbel: 3.5” Overall Height w/ Corbel: 12.5” Weight: 96 lbs. 12” for 5ft. mantel (18” for6 ft.mantel) 1/4” 8”WIDE 12” for 5ft. mantel (18” for6 ft.mantel) Bracketholesare inset1/4” fromedge Apply mortar or construction adhesive to top of corbels and back of shelf Attach corbels to masonry or blocking using 4 - 3/8 x 4”lag screws 1/2 x 4”Lag Screws (4x) (w/anchors if applicable) W A L L FRONTVIEW FRONTVIEW CORBEL BRACKET BRACKET BRACKET Corbel 9”Depth Distancebetweenholes 61/4” BracketHoles 5/8” BRACKET BRACKET BRACKET BRACKET SHELF SHELF SHELF CORBEL CORBEL CORBEL CORBEL CORBEL SIDEVIEW SIDEVIEW Press shelf down onto brackets and back against wall FRONTVIEW SIDEVIEW M a s o n r y B l o c k i n g or 3 - Step Installation: 1. 2. 3. BracketHoles 5/8” Actual finish colors and distressing may vary from photos. Finish samples available. Natural Smoke Safari Leather 27 Your Mantel Headquarters! Visit our website for more photos, 3D product animations, and information on our products and fine furniture quality finishes —www.pearlmantels.com Actual finish colors and distressing may vary from photos. © 1995-2019 Pearl Mantels Corporation ® Wood and MDF are considered combustible materials. Heat clearances must be adhered to. Before installing, check your local building codes and the manufacturer’s instructions for your specific fireplace insert or stove. For all surrounds and shelves: hardware is not included to attach the hanger board to the mounting surface. Actual finish colors and distressing may vary from photos. *All Pearl Mantels are manufactured individually. Measurements listed are standard, but tolerances may vary. We encourage you to measure your mantel prior to installation and for all custom-fit applications. B ecause each mounting surface is different, hardware is not included to attach the hanger board to the mounting surface. Please consult a professional for advice.
RkJQdWJsaXNoZXIy MTk1NDEz